The Vermont State-owned three-span girder bridge over the White River in White River Junction, VT, had the south bridge pier (supporting the middle and south span) fail during the flooding that ensued from Irene. This gallery is a comprehensive look at the progression of literally one hour after the failure to the most current component of work to save the structure. Watermark does not appear on purchased photos...
Original size: 1352x1880 |
Current: 432x600 |